TRAFFIC UPDATE – OPEBI / ALLEN
 
Overnight construction work is still ongoing with a section of the road (about 65 metres) closed.
 
Contraflow is in place while the affected section will be reopened as soon as possible.
 
Other areas within the axis inward and outward are good to go.
 
No impediment recorded.
March 28, 2026
L'évolution historique des pronostics sportifs selon Betzoid France