AJEGUNLE / APAPA (TRAFFIC UPDATE)
High influx of tankers and articulated vehicles occupying one lane from Sifax Intersection via Total Bridge down to Total Under Bridge accessing various depots.
The alternate lane remains free-flowing for cars and other vehicles.
Similarly, flatbed trucks and articulated vehicles have occupied one lane from the Signage Board through RRS Checkpoint via Danlami Bridge down to Area B.
The second lane is available and moving well for other road users.
