INCIDENT REPORT – IKORODU ROAD / ONIPAN AXIS
A high-capacity interstate bus has developed a mechanical fault at Onipan inward Fadeyi, partially blocking the main carriageway.
The vehicle is occupying about 50% of the road, affecting traffic flow backward along the corridor.
🚧 Traffic Impact: Slow movement and intermittent congestion.
🚔 A tow vehicle has been contacted for evacuation, while the driver is also making efforts to reposition the vehicle.
