FLASH UPDATE FROM VICTORIA ISLAND (OZUMBA MBADIWE CORRIDOR)
Motorists are advised to expect very slow vehicular movement inward Bonny Camp due to a failed section of the road and flooding, which has reduced the carriageway to a single lane after affecting about 50% of the roadway.
The resulting backlog now extends beyond Law School, with heavy delays caused by the morning traffic influx.
As an interim measure, personnel from Cemex Construction have filled sections of the affected potholes with mixed granite to improve road conditions.
Traffic managers remain on ground regulating traffic and advising motorists to exercise patience, cooperate with officers on duty, and drive cautiously through the affected corridor.
