FLASH UPDATE FROM IJU–ISHAGA AXIS
Railway track repairs by the Nigerian Railway Corporation (NRC) are ongoing at Jonathan Coker.
All routes around the work area remain cordoned off. Motorists are advised to use the Abattoir–Abule Egba Corridor as an alternative route.
The exposed section of the railway is currently being covered with granite, while efforts are underway to open one lane to reduce traffic pressure.
Traffic Status: Traffic officers are strategically positioned to manage the situation. Other parts of the axis remain calm with no additional impediments.
