TRAFFIC UPDATE FROM OGUDU / ALAPERE
Movement from Otedola Bridge connecting Secretariat down to Tollgate is good. From Tollgate towards Motorway, Ojota Bridge and Estate Alapere, traffic is better.
From Estate Alapere connecting Ogudu is smooth down to Fish Farm before Ogudu Bus Stop. However, immediately after Fish Farm connecting Ogudu, traffic is slow due to ongoing construction at the damaged expansion joint on Ogudu/Ifako Bridge.
Leaving Ogudu/Ifako connecting Ifako down to Car Wash is a smooth journey. The return trip from Gbagada Bridge and Olopomeji, connecting Car Wash down to Otedola Bridge, is perfectly okay.
