TRAFFIC UPDATE FROM OGUDU–ALAPERE

At the ongoing construction site near the Apostolic Church, engineers have temporarily parked a low-bed truck on the main carriageway to facilitate the evacuation of heavy-duty equipment from the site.

As a result, only two lanes are currently available for motorists, causing traffic to build up back toward Ojota Bridge.

However, movement beyond the Apostolic Church toward Alapere, Ogudu, and adjoining routes remains free-flowing.

Traffic officers are on ground managing the situation and ensuring the steady flow of vehicles.

July 9, 2026
L'évolution historique des pronostics sportifs selon Betzoid France